+
+
PROJECT
16.056.01 | WAP Haute Borne
-
The WaP ‘Work and Progress’-building is a timber office building consisting of three floors and an underground car park with slabs in reinforced concrete. The wooden structure is a mixed system with steel beams, floors and walls in massive CLT-plates, and prefab roofing elements in timber framing. The geometric complexity of the building was challenging and demanded specific solutions.
- PROJECT DATA
-
MissionComplete mission for C & S engineering for the execution of a timber structure.Study2016-2017Execution2017-2017ClientProjectimBudget€3.550.000Area2.500m2Architectde Alzua+SiteVilleneuve d'Asq, France show on mapCopyrightsStabilame, de Alzua+, Ney & Partners WOW