Visé, Belgium
Viaduc des Allemands
+
PROJECT

16.067 | Viaduc des Allemands

The structure of the bridge comprises riveted steel trusses supported by non-reinforced concrete pillars. Because of its strategic importance the bridge was blown up during WWII. Shortly after the war it was again rebuilt as an exact replica. Upon inspection it was revealed that the steel structure has suffered considerable degradation due to corrosion rendering it incompatible with the safety requirements of its function. So, a safe use of the viaduct was no longer guaranteed. Infrabel has therefore decided to replace the bridge, but in its original form.

PROJECT DATA
Mission
Structural analysis of new superstructure, substructure remains with local strengtening.
Study
2016-2017
Execution
2017-2018
Client
Infrabel
Budget
€15.000.000
Length
537m
Area
4.028m2
Architect
Ney & Partners
Site
Visé, Belgium show on mapshow on map
Copyrights
JL Deru - Ney & Partners