+
+
PROJECT
17.001 | Swimming Pool Infrastructure Ostend
-
The new urban complex consists of sports facilities made up of an Olympic-sized pool and a 4.5 m deep instruction pool, both equipped with movable bottoms for optimum use. There is also a large recreational swimming zone with 2 hung slides, monkey bars, and toys elements. A spacious cafeteria and many divisible multipurpose areas are planned as well. The building program also includes 22 social apartments. The building is adhering to the passive building standards.
- PROJECT DATA
-
MissionComplete study for C & S engineering.Study2017Execution2018-2021ClientSportbuilders nvBudget€16.500.000Area13.000m2ArchitectVenhoevenCS & B2AISiteOstend, Belgium show on mapCopyrightsBoydens Engineering - VenhoevenCS and B2AI