07.029 | Renovation Bierger-Center
-
The Bierger-Center’s includes the refurbishment of the existing buildings, new building to house the wedding hall, the reception room and technical rooms, and a suspended steel footbridge connecting the centre to the City Hall. The steel footbridge includes a pair of suspension cables. The footbridge is an internal space with a glass façade. The support on the existing City Hall is as light as possible in order to limit work on the existing building.
- PROJECT DATA
-
MissionComplete mission for civil and structural engineering for the different parts of the renovation and footbridge.Study2008-2010Execution2010-2014ClientCity of LuxembourgBudget€16.000.000Area4.600ArchitectSTEINMETZDEMEYERSiteLuxembourg, Luxembourg show on mapCopyrightsC. Weber
- DISTINCTIONS
- Bauhärepräis 2016.