QR Code
https://ney.partners/project/mass-timber-school-building-schatkist/
Brussels, Belgium
Extension school building ‘De Schatkist’
+
PROJECT

20.042 | Extension school building ‘De Schatkist’

The project consists of extending an existing school building to offer better learning conditions and more capacity for the steady increase in students. With the addition of new volumes and the disposition around a courtyard, a new spatial experience is created. The added volumes contain a multipurpose hall, multifunctional classrooms, a library and a day care centre. The entire building is erected with mass timber, using a hybrid of timber frame and CLT panels. All timber is kept visible from the inside. Therefore special care went into the connections and fire protection. The visual and tactile qualities of timber were chosen to create a warm and inviting environment for the children of the primary school.

PROJECT DATA
Mission
Complete mission for C & S engineering.
Study
2020-2021
Execution
2022-2023
Client
SMDB De Schatkist
Budget structure
€1.200.000 HTVA
Budget
€4.600.000 HTVA
Area
2000m2
Architect
a2o-architecten
Site
Brussels, Belgium show on mapshow on map
Copyrights
Stijn Bollaert

share this