+
+
PROJECT
20.071 | Jewish Museum of Belgium
-
The existing museum on the Brussels Sablon will be extended and restructured over six floors. Behind the preserved existing facade, the new floors will be constructed with spacious spans of 15 m. The basement will also be extended and deepened to make room for permanent and temporary exhibitions.
- PROJECT DATA
-
MissionComplete mission for C & S engineering.Study2020ClientBelirisBudget structure€1.000.000Budget€4.860.000Area2.850ArchitectTab Architects, Barozzi Veiga and Barbara Van der WeeSiteBrussels, Belgium show on mapCopyrightsTab Architects, Barozzi Veiga and Barbara Van der Wee