QR Code
https://ney.partners/project/ingelmunster-bridge/
Ingelmunster, Belgium
Bridge ‘Brigandsbrug’
+
PROJECT

08.030.01 | Bridge ‘Brigandsbrug’

Working with 360 Architecten and Bureau Bas Smets, Ney & Partners designed an open steel-concrete arch bridge with multiple spans. The bridge has a total length of 286 m and a main span of 110 m. The two parallel steel structures of the arches and main girders rest on the concrete deck that connects them. This light and efficient structure creates maximum transparency in the landscape.

PROJECT DATA
Mission
Complete mission for architectural and structural design.
Study
2013-2017
Execution
2017-2020
Client
Ingelmunster City Council
Budget
€17.350.855
Length
286m
Architect
Ney & Partners - 360 Architecten - Bureau Bas Smets
Site
Ingelmunster, Belgium show on mapshow on map
Copyrights
360 - Ney & Partners - Bureau Bas Smets - Corentin Haubruge
DISTINCTIONS
BENELUX Steel Bridge Contest 2023 (BE).
Shortlisted IABSE AWARDS for Road and Rail bridges 2022 (CH).
Publica Awards, Brussels, special mention in the category Urban Development, infrastructure and mobility 2020 (BE).

share this

Select a Pickup Point