QR Code
https://ney.partners/project/infrastructure-ooijen-wanssum/
Ooijen, Netherlands
Infrastructure Ooijen – Wanssum
+
PROJECT

15.089 | Infrastructure Ooijen – Wanssum

Since 2015, numerous measures have been taken in the area between the villages of Ooijen and Wanssum (northern Limburg) to improve water safety: the Oude Maasarm was reactivated, dykes were moved and two high-water channels were constructed. In Wanssum, the port was also expanded and a ring road was built. Ney & Partners was responsible for the architectural and structural designs of the various engineering structures (4 bridges, 2 subways and one cycle bridge).  The combination Mooder Maas – Combination Dura Vermeer – Ploegam and Ney & Partners worked together on the assignment, which was delivered in 2022. In 2021, the project was honored with the Landzine International Landscape Award.

PROJECT DATA
Mission
Complete mission for architectural and structural design for eight projects.
Study
2015-2016
Execution
2016-2022
Client
Combinatie Dura Vermeer – Ploegam
Budget
€10.880.000
Architect
Ney & Partners
Site
Ooijen, Netherlands show on mapshow on map
Copyrights
Paul Poels Fotografie
DISTINCTIONS
Landzine International Landscape Award 2021.

share this