Footbridges Schoten
+
PROJECT

20.050 | Footbridges Schoten

The starting point for the design was a bridge that would require ‘no maintenance’. Therefore, the two bridges with a span of 17 m and width of 2.1 m were constructed in UHPC ultra-high strength concrete. Properly executed concrete construction does not require any maintenance. Moreover, this material can be used to create slender and beautiful objects. The advantage of UHSB is that the reinforcement coverage can be reduced from 6 cm to 2 cm.

PROJECT DATA
Mission
Complete mission for architectural & structural design.
Study
2020-2021
Execution
2021-2022
Client
Municipality of Schoten
Budget
€140.000
Architect
Ney & Partners
Site
Schoten, Belgium show on mapshow on map
Copyrights
Jasper Léonard
DISTINCTIONS
Nomination FEBE Elements Awards 2022 - category precast structures