PROJECT
08.044 | Footbridge Léon Tchiniss
-
The structure links the place Vivegnis to the ‘Coteaux’ and overpasses the railways. The steel footbridge has a span of 29.5 m and is supported at one side by an old retaining wall and at the other side by a prismatic wood structure.
-
PROJECT DATA
-
Mission
Complete mission C & S engineering.
Study
2004-2014
Execution
2017-2020
Client
City of Liège
Budget
€1.541.000
Length
30m
Area
320m2
Architect
Atelier d'Architecture Alain Richard - M. Cornet
Collaboration
WOW Engineering
Status Ney
co-contractor
Site
Liège,
Belgium show on map
Copyrights
Alain Janssens - www.doublepage.be
-
DISTINCTIONS
-
Nomination Timber Awards 2021 - Green Solution Awards 2019, category 'Green Infrastructure' and Public Award.