+
+
PROJECT
14.079 | Footbridge Marina Cadzand
-
Starting from the preliminary design by OKRA, Ney & Partners put all their knowledge to the use of creating a construction scheme in line with the architectural intentions. To master the complex geometry, an integral 3D-model was created, and integrated into the BIM-model of the overall project. Of particular attention here was the exact position of the oblique columns.
- PROJECT DATA
-
MissionExecution study for the architectural and structural design.Study2014-2015Execution2015-2016ClientEiffage-IemantsLength85ArchitectOkra Landschape ArchitectsSiteCadzand, Netherlands show on mapCopyrightsJasper Leonard