QR Code
https://ney.partners/project/extension-s-m-a-k-museum-of-contemporary-art/
Ghent, Belgium
Extension S.M.A.K. – Museum of Contemporary Art
+
PROJECT

SN23.185 | Extension S.M.A.K. – Museum of Contemporary Art

The S.M.A.K. (Stedelijk Museum voor Actuele Kunst) has long needed more space to permanently display works from its own collection. The winning design proposal obtained through the Open Call procedure by the Flemish Government Architect addresses the need for two museum buildings that in the Citadel Park : the S.M.A.K. Hall, where the current museum is housed, and the Collection House, located at the site of the former ‘Casino Head’.

Ney & Partners will be responsible for the complete stability study. Specifically, through a thorough review, the potential of the existing structures will be maximized. Additionally, with a few limited localized interventions, we will expand the usability of the existing structures. Finally, in the design of the new structure, the environmental impact will be minimized by making the correct choice of materials and optimizing material usage.

PROJECT DATA
Mission
Complete mission for C & S engineering for a preliminary design
Study
2023-2024
Client
sogent - S.M.A.K.
Architect
noAarchitecten -David Kohn architects - Asli Çiçek
Site
Ghent, Belgium show on mapshow on map
Copyrights
noAarchitecten - David Kohn architects - Asli Çiçek

share this