+
+
PROJECT
14.063.SN | Brunfaut Tower Rehabilitation
-
Rehabilitation of the social housing “Brunfaut” tower with maximum occuppancy. This proposal maintains the existing steel structure, and extends the original volume by offseting the main facades and adding several floors on top. The existing 16-story tower will rise to 21-story with a height of 62m. These operations will provide a greater diversity of housing, a better urban integration and contemporary standards of comfort and safety.
- PROJECT DATA
-
MissionComplete mission for C and S engineering.Study2014-2017Execution2019-2023ClientLe Logement MolenbeekoisBudget structure€4.800.000Budget€17.000.000Area11000 m2m2ArchitectAtelier 229 / DethierSiteBrussels, Belgium show on mapCopyrightsAtelier 229 / Dethier